Skip to content

Fehmarnbelt tunnel contractors appointed

The Danish political parties behind the Fehmarnbelt link mandated Femern A/S appoints the preferred bidders for the main tunnel contracts with the aim of entering conditional contracts no later than mid-May 2016.

Conditional contracts mean that final and binding contracts will be signed with the successful contractors, but that construction work will be postponed until the German construction permit is in place. The contracts are valid until the end of 2019 with the option to renegotiate at that time.

Once the final conditions for conditional contracts are settled satisfactorily between Femern A/S and the winning contractors, the company will present the results to the Minister of Transport- and Building before the contracts are signed in May 2016.

The world's longest immersed road and rail tunnel

The Fehmarnbelt Fixed Link will connect Eastern Denmark and Germany and will be the world's longest immersed road and rail tunnel. The fixed immersed tunnel link across the Fehmarnbelt will be more than 18km long and carry a four-lane motorway alongside a twin track-electrified railway.

The Fehmarnbelt Fixed Link tender consisted of four contracts: the tunnel north, the tunnel south, tunnel dredging and reclamation and the tunnel portals and ramps. The Fehmarn Belt Contractors consortium is the preferred bidder for the tunnel dredging & reclamation contract. The contract is conditional to obtaining the outstanding environmental permits that have yet to be issued by the German authorities. To the best of the company's knowledge, these permits are not expected to be issued before 2017.

Fehmarnbelt LINK map

Fermern tunnel map
Source: Femern A/S

The preferred bidder for the immersed tunnel including the tunnel factory:

  • Femern Link Contractors (FLC)

Contractors:

  • VINCI Construction Grands Projets S.A.S. (France)
  • Per Aarsleff A/S (Denmark)
  • Wayss & Freytag Ingenieurbau AG (Germany)
  • Max Bögl Stiftung & Co. KG (Germany)
  • CFE SA (Belgium)
  • Solétance-Bachy International S.A.S. (France)
  • BAM Infra B.V. (Netherlands)
  • BAM international B.V. (Netherlands)
  • Sub-contractor:Dredging International N.V. (Belgium)
  • Consultant: COWI A/S (Denmark)

The preferred bidder for portals and ramps:

  • Femern Link Contractors (FLC)

Contractors:

  • Per Aarsleff A/S (Denmark)
  • VINCI Construction Grands Projets S.A.S. (France)
  • Wayss & Freytag Ingenieurbau AG (Germany)
  • Max Bögl Stiftung & Co. KG (Germany)
  • CFE SA (Belgium)
  • Solétance-Bachy International S.A.S. (France)
  • BAM Infra B.V. (Netherlands)
  • BAM international B.V. (Netherlands)
  • Consultant: COWI A/S (Denmark)

The preferred bidder for dredging and reclamation:

  • Fehmarn Belt Contractors (FBC)

Contractors:

  • Boskalis International B.V. (Netherlands)
  • HOCHTIEF Solutions AG (Germany)
  • Ed. Züblin AG (Germany)
  • Van Oord Dredging and Marine Contractors B.V. (Netherlands)
  • Consultants: SWECO (Denmark)

fact About the Fehmarnbelt link

The Fehmarnbelt link will be built as an immersed tunnel between Rødbyhavn on Lolland, Denmark and the German island of Fehmarn. The tunnel will become the backbone of transport in a new European region as it will offer new opportunities for business, tourism and culture.

Companies will benefit from a direct, fast and flexible motorway and rail link to Denmark’s largest export market, Germany. With the Fehmarnbelt link and the new rail facilities, it will be possible, for example, to travel from Copenhagen to Hamburg in two and a half hours. Today, the same rail journey takes four and a half hours. In this 
 
With more freight to be transported by rail, both cars and trains will save on distance and time, which will benefit the environment. In this way, Denmark is promoting green freight.

contact How can we help your company?

If you want to know more about how we can help your company establish in Denmark, please do not hesitate to contact our dedicated advisors:
Loading...